Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Siemens scores Golden Pass LNG compression gig
Clean Fuel

May 27, 2020 · about 6 years ago

Siemens scores Golden Pass LNG compression gig

Siemens Gas and Power has secured a contract for the supply of three cryogenic boil-off gas (BOG) compressor trains for the Golden Pass LNG export terminal.

1 minutes read
  • LinkedIn
  • X
  • Email
Siemens scores Golden Pass LNG compression gig
Courtesy of Siemens

Siemens Gas and Power has secured a contract for the supply of three cryogenic boil-off gas (BOG) compressor trains for the Golden Pass LNG export terminal.

The contract was awarded by CCZ JV, a joint venture between Chiyoda International Corporation, McDermott International, and Zachry Group.

The export facility in Sabine Pass, Texas, USA, is a joint venture between units of Qatar Petroleum and ExxonMobil. It will be integrated into the existing Golden Pass LNG import terminal, Siemens noted.

The project includes the construction of three liquefaction process trains. Each train will have a nominal output of approximately 5.2 million metric tons per annum (MTPA).

Siemens Gas and Power’s scope of supply covers the engineering, manufacturing, and testing of the three, single-shaft centrifugal BOG compression packages. The company will also deliver installation and commissioning activities.

Each of the compressor packages will be driven by a 6.8-megawatt (MW) electric motor. Manufacturing, testing, and packaging will take place in Duisburg, Germany.

The project scope also includes a frame agreement to supply all low-voltage electric motors and electric variable speed drives (1 – 200 horsepower) and all medium-voltage (250 – 1,500 horsepower) electric motors.

In addition to the BOG compressor trains, Siemens Gas and Power will also provide steam turbine generator sets for the Golden Pass LNG export terminal.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelLNGInfrastructure

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free