Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›EEW pipes for Formosa 2 jackets
Business Developments & Projects

June 17, 2020 · about 6 years ago

EEW pipes for Formosa 2 jackets

EEW Group is producing the steel pipe components for the 47 jacket foundations to be installed on the Formosa 2 wind farm offshore Taiwan. The production of the steel pipes for the jackets started in January at EEW Korea, EEW KHPC, and EEW Malaysia and is expected to be completed in October 2020. Wi

2 minutes read
  • LinkedIn
  • X
  • Email
First Pin Piles for Formosa II OWF at Gwangyang Port, South Korea.

EEW Group is producing the steel pipe components for the 47 jacket foundations to be installed on the Formosa 2 wind farm offshore Taiwan.

The production of the steel pipes for the jackets started in January at EEW Korea, EEW KHPC, and EEW Malaysia and is expected to be completed in October 2020.

With a total tonnage of 47,500 MT, the steel pipes will be assembled into jacket foundations by Saipem and PT SMOE.

As previously reported , EEW Group is also in charge of manufacturing and delivering the 194 pin piles for the 376 MW project.

With lengths up to 78.9 metres, an outside diameter of 2.4 metres, weights up to 280 MT, the pin piles are also being manufactured at EEW KHPC, EEW Korea, and EEW Malaysia, with more than half of the units already completed.

In total, EEW Group will deliver 91,500 tons of construction steel pipes for the project.

“The development of renewable energy sources in East Asia is a role model for other countries. After the successful completion of the first Formosa I Phase 2 project (for which we supplied 20 monopiles from EEW SPC) we are proud to be a part of the follow-up project Formosa II,” said Christoph Schorge , CEO of the EEW Group.

Located between four and ten nautical miles off Miaoli County, Formosa 2 will comprise 47 Siemens Gamesa 8 MW turbines installed in water depths of up to 55 metres. The wind farm is expected to be commissioned in 2021.

The Formosa 2 wind farm is being developed by a partnership between JERA, Macquarie’s Green Investment Group, and Swancor Renewable Energy.

Jan De Nul is the EPCI contractor for the project’s foundations and subsea cables.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & Projects

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago