Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Deepwater Installation›Watch complex subsea operation of installing Dvalin Xmas trees
Deepwater Installation

July 8, 2020 · about 6 years ago

Watch complex subsea operation of installing Dvalin Xmas trees

Wintershall Dea last December installed three Xmas trees on its Dvalin gas development, which has now moved from the drilling phase to the completion phase.

2 minutes read
  • LinkedIn
  • X
  • Email
Watch complex subsea operation of installing Dvalin Xmas trees
Dvalin Xmas tree; Source: Wintershall Dea

Wintershall Dea last December installed three Xmas trees on its Dvalin gas development, which has now moved from the drilling phase to the completion phase – into the direction of the first gas.

This content is available after accepting the cookies.

The Wintershall Dea-operated Dvalin gas field is located in the Norwegian Sea.

It is being developed as a subsea tieback with four subsea wells, tied back to the Equinor-operated Heidrun host platform, using a subsea template on the seabed.

Using the Transocean Arctic rig, Wintershall Dea started drilling four production wells on the Dvalin gas field back in August 2019. These operations were expected to last about a year.

First gas from the field is expected to be produced in the fourth quarter of 2020.

In December 2019, under harsh weather conditions in the Norwegian Sea, the 52 tonnes Xmas trees were lowered almost 400 metres down to the seabed at the Dvalin field, 260 kilometres north of Kristiansund.

The Xmas trees are a set of valves and other equipment that secures the well and are key components for drilling the production wells at Dvalin.

Tore Øian , Dvalin drilling manager, said: “It was a complex subsea operation with big swells, waves and tide. Under these conditions, the rig was constantly moving, and it was very challenging to control the 52 tonnes Xmas trees and let them safely down to the wellhead on the seabed. It required a high level of coordination between all the parties involved”.

Wintershall Dea has already received consent from Norway’s Petroleum Safety Authority to use the facilities on the Dvalin field.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Deepwater InstallationFossil EnergyOil & GasRigsSubseaBusiness & FinanceBusiness Developments & ProjectsEquipmentExploration & ProductionInfrastructureOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free