Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›New integrated cable protection solution from Balmoral
Cabling

July 14, 2020 · about 6 years ago

New integrated cable protection solution from Balmoral

Balmoral, a provider of cable protection systems (CPS) for inter array and export cables for fixed and floating offshore wind installations, has created an integrated CPS the company reports is unique. The Discovery Unit, a combination of product R&D, materials and testing specialists, created the i

2 minutes read
  • LinkedIn
  • X
  • Email
New integrated cable protection solution from Balmoral
Balmoral

Balmoral, a provider of cable protection systems (CPS) for inter array and export cables for fixed and floating offshore wind installations, has created an integrated CPS the company reports is unique.

The Discovery Unit, a combination of product R&D, materials and testing specialists, created the integrated CPS.

The patented system, which is available in three standard sizes, includes a combination of bend restrictors and a bend stiffener, foundation interface device, standard dynamic unit and a detachable pull head, all of which is designed, manufactured and brought together in-house before being tested on the company’s test rig.

Dr Aneel Gill , product R&D manager, said: “Our systems are designed based on the fatigue limit state (FLS) and offer something different because of their unique diverless removal feature and the ability to account for free span caused by scour development.

“Our patented fibre reinforced technology adds stiffness to the system controlling the curvature during the project lifespan. This reduces the amount of movement experienced by the cable, improving fatigue performance and greatly reducing the risk of failure through the life of field.

“The low weight components of the system permit efficient transportation, handling and assembly on deck. The system also allows for diverless removal of the CPS should cable maintenance be required.”

Ian Milne , sales manager, added: “ With over 300 employees at our Aberdeen facility we retain an impressive complement of design engineers, project managers, R&D, laboratory and testing personnel helping us maintain and strengthen our position as a leading subsea solutions provider for the energy sector.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingOffshore WindSubseaResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free