Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›First Formosa 2 hardware arrives in Port of Taichung
Ports & Logistics

July 22, 2020 · about 6 years ago

First Formosa 2 hardware arrives in Port of Taichung

The first batch of pin piles for the Formosa 2 jacket foundations have been offloaded at the Port of Taichung and are now waiting for installation, which is about to start soon. Each of the pin piles – produced by EEW Korea, EEW KHPC and EEW Malaysia – is up to 78.9 metres long, has […]

2 minutes read
  • LinkedIn
  • X
  • Email
Four Formosa 2 pin piles lined up at the Port of Taichung

The first batch of pin piles for the Formosa 2 jacket foundations have been offloaded at the Port of Taichung and are now waiting for installation, which is about to start soon.

Each of the pin piles – produced by EEW Korea, EEW KHPC and EEW Malaysia – is up to 78.9 metres long, has an outside diameter of 2.4 metres, and weighs up to 280 tonnes.

In October 2019, Jan De Nul was selected as the EPCI contractor for the project’s foundations and subsea cables.

The company later subcontracted EEW to produce the pin piles, Saipem and Sembcorp to deliver the jacket foundations, and Seaway 7 to install both at the Formosa 2 project site, located off the coast of Miaoli County in northwestern Taiwan.

Jan De Nul has also subcontracted several locally headquartered companies, including Hunghua Construction, which is in charge of transporting the foundation piles from the Port of Taichung to the offshore construction site, together with other local companies including Taiwan International Ports, Ta Jia International, Jin An Logistics International, and Glory Shipping Agency Corporation.

The construction on the Formosa 2 project started in June, with onshore and nearshore works for the landfall site.

The 376 MW wind farm, developed by a partnership between JERA, Macquarie’s Green Investment Group, and Swancor Renewable Energy, will comprise 47 Siemens Gamesa 8 MW turbines installed in water depths of up to 55 metres.

Formosa 2 is expected to be commissioned in 2021.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

19 days ago

Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

19 days ago
Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago