Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›German ministry re-ups FINO2 tender
Operations & Maintenance

July 23, 2020 · about 6 years ago

German ministry re-ups FINO2 tender

Germany’s Federal Ministry for Economic Affairs and Energy (BMWi) has once again issued a tender for an operator of the FINO2 research platform. BMWi had issued a similar tender back in March which was cancelled in June after none of the offers received met the required conditions. The ministry now

1 minutes read
  • LinkedIn
  • X
  • Email
German ministry re-ups FINO2 tender

Germany’s Federal Ministry for Economic Affairs and Energy (BMWi) has once again issued a tender for an operator of the FINO2 research platform.

BMWi had issued a similar tender back in March which was cancelled in June after none of the offers received met the required conditions.

The ministry now intends to commission the operation of FINO2 from 1 March 2021 to 28 February 2025, with an optional one-year extension. The tender will remain open until 23 September.

The operator will provide scheduled maintenance and repair, organize research operations in coordination with the measuring institutes, and organize and control all of the repair work, among other tasks.

The selected party will also be in charge of ensuring future research needs, ensuring the technical security of the platform and the safety of people and the environment, public relations, and coordination and cooperation with all relevant authorities.

The FINO2 platform is located in the German Exclusive Economic Zone (EEZ), about 33 kilometres north of the island of Rügen in the Baltic Sea.

As the second of a total of three research platforms of the BMWi, the FINO2 research platform was built in 2007.

The aims of these research platforms in the German North Sea and the Baltic Sea (FINO = Forschungsplattformen in Nord- und Ostsee) is to explore the environmental conditions at the site and to identify possible effects of offshore wind farms on the marine environment.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

18 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

18 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

18 days ago