Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›GMS wraps up intervention job on live well using cantilever workover
Business & Finance

July 28, 2020 · about 6 years ago

GMS wraps up intervention job on live well using cantilever workover

GMS has completed its first well intervention workscope using the company’s cantilever workover system, installed on the self-propelled vessel GMS Evolution.

2 minutes read
  • LinkedIn
  • X
  • Email
GMS Evolution

Gulf Marine Services (GMS) has completed its first well intervention workscope using the company’s cantilever workover system, installed on the self-propelled vessel GMS Evolution.

GMS said on Tuesday that, under a contract for a NOC client in the MENA region, this was the first occasion that the cantilever system has been used on a live well.

The technology was designed and developed by GMS.

GMS explained that the key operational advantages of cantilever technology include eliminating lifting over live wellheads, reduction in well-intervention time, a radical improvement in transfer time, platform to platform, over conventional rigs, and consequent cost savings for the field operator.

According to GMS, the workscope involved a heavy coiled tubing well intervention, required multiple changes of bottom hole assembly, and was carried out in a third of the time that this operation would traditionally take.

GMS added that further efficiencies were achieved, with movements between platforms reduced to a tenth of the time taken by a conventional drilling rig, which is customarily used for intervention activities.

The GMS Evolution has now moved to the next platform in the field to complete a similar scope.

Tim Summers , GMS Executive Chairman, said: “GMS is the only company in the world with this SESV technology”.

Summers added: “The cantilever system onboard Evolution is capable of carrying out aspects of well workover activity normally conducted by a drilling rig; however, its real strength comes when frequent moves within the field are required.

“Being self-propelled, and unlike a drilling rig, the vessel does not rely on tug support so can move between locations at a fraction of the time a drilling rig requires. This offers significant cost and time savings to our clients for a well intervention programme”.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsEquipmentInfrastructureOperations & MaintenanceVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago