The global LNG regasification capacity under construction could hit 144 million tonnes per annum in 2020, a 10-year high.
According to the consultancy Wood Mackenzie, the capacity under construction includes 33 new terminals, adding 92.8 mtpa, and a further 51.0 mtpa of capacity which is set to be added at existing terminals.
