Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Bombora taps Kingswood Engineering for mWave intervention tool structure
Subsea

September 18, 2020 · about 6 years ago

Bombora taps Kingswood Engineering for mWave intervention tool structure

Ocean energy solutions company Bombora has recently selected Kingswood Engineering for the fabrication of the intervention tool structure for the mWave wave energy converter demonstrator. The intervention tool structure is the floating structure which facilitates the subsea installation and removal

1 minutes read
  • LinkedIn
  • X
  • Email
Bombora mWave WEC
Bombora

Ocean energy solutions company Bombora has recently selected Kingswood Engineering for the fabrication of the intervention tool structure for the mWave wave energy converter demonstrator.

The intervention tool structure is the floating structure which facilitates the subsea installation and removal of modules.

It is a steel fabrication with approximate mass of 18 Tons.

The company will deliver the complete main structure to Pembroke Dock.

Kingswood Engineering will also be responsible for any logistics required in delivering the intervention tool structure to an area within the dockyard in Pembroke Dock

In January this year, Bombora said it had contracted more than 70 percent of its £17-million Pembrokeshire demonstration project.

Specifically, deadline for this tender was 25 March 2020.

Bombora’s mWave demonstrator received full test site consents in the autumn of 2019, with trials scheduled for this year.

However, Covid-19 pandemic delayed everything as many suppliers had to shut temporarily.

As a result, Bombora also put off the deployment of its 1.5MW mWave demonstration device in Wales to 2021.

Related Articles

Marine Energy

Bombora WEC cell module reaches assembly workshop

2 min read

In July this year, it saw WEC ‘cell module’ structure delivered from the Altrad’s fabrication workshop to the assembly workshop at Mainstay Marine Solutions.

The cell module is the first of four 15-meter-long, structures that form Bombora’s 75-meter-long, subsea mWave.

The project gets support from a £10.3-million European Regional Development Fund (ERDF) grant through Welsh Government.

Bombora’s first grid connected project will have 20 cell modules and generate 3.0MW.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaTidal & Wave EnergyEquipmentProject & TendersResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free