Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Marine Energy›PECMAG PTO system on trials at Port of Montrose
Marine Energy

September 28, 2020 · about 6 years ago

PECMAG PTO system on trials at Port of Montrose

Subsea engineering firm Oceaneering and partners recently deployed their PECMAG power take-off technology at Port of Montrose for testing. The Power Electronic Controlled Magnet Gear (PECMAG) is one of the projects in Wave Energy Scotland PTO call. The PECMAG PTO system is a modular all-electric sys

1 minutes read
  • LinkedIn
  • X
  • Email
PECMAG PTO
Wave Energy Scotland

Subsea engineering firm Oceaneering and partners recently deployed their PECMAG power take-off technology at Port of Montrose for testing.

The Power Electronic Controlled Magnet Gear (PECMAG) is one of the projects in Wave Energy Scotland PTO call.

The PECMAG PTO system is a modular all-electric system with magnetic gearing that developed to suit a variety of WEC devices, offering both rotary and linear actuator systems.

Medium scale prototypes of both the rotary and linear actuator PECMAG systems have been manufactured and bench tested – with measurements confirming the high conversion efficiency performance figures expected from the contactless gear system.

Input from WEC developers, has also aided the PECMAG prototypes development, resulting in a thorough understanding and refinement of the PECMAG technology.

The testing and LCOE modelling undertaken in the Stage 2 project has identified performance and manufacturability improvement points.

The Stage 3 project will extend the bench testing and refinement to include the bearings and assembly/manufacture processes for the gear system culminating in wet testing in real sea waves on a WEC test platform.

In March 2018, Ecosse Subsea Systems secured £2.5-million funding from Wave Energy Scotland (WES) to develop a magnetic gear system which could be pivotal in developing wave energy convertors.

Related Articles

Oceaneering Acquires Ecosse Subsea
Offshore Wind

Oceaneering Acquires Ecosse Subsea

1 min read

In addition, sub-contractors for the project include Supply Design Ltd, Pure Marine Ltd and also Bathwick Electrical Design Ltd.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Marine EnergySubseaTidal & Wave EnergyResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free