Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Research & Development›PECMAG PTO system on trials at Port of Montrose
Research & Development

September 28, 2020 · about 5 years ago

PECMAG PTO system on trials at Port of Montrose

Subsea engineering firm Oceaneering and partners recently deployed their PECMAG power take-off technology at Port of Montrose for testing. The Power Electronic Controlled Magnet Gear (PECMAG) is one of the projects in Wave Energy Scotland PTO call. The PECMAG PTO system is a modular all-electric sys

1 minutes read
  • LinkedIn
  • X
  • Email
PECMAG PTO

Subsea engineering firm Oceaneering and partners recently deployed their PECMAG power take-off technology at Port of Montrose for testing.

The Power Electronic Controlled Magnet Gear (PECMAG) is one of the projects in Wave Energy Scotland PTO call.

The PECMAG PTO system is a modular all-electric system with magnetic gearing that developed to suit a variety of WEC devices, offering both rotary and linear actuator systems.

Medium scale prototypes of both the rotary and linear actuator PECMAG systems have been manufactured and bench tested – with measurements confirming the high conversion efficiency performance figures expected from the contactless gear system.

Input from WEC developers, has also aided the PECMAG prototypes development, resulting in a thorough understanding and refinement of the PECMAG technology.

The testing and LCOE modelling undertaken in the Stage 2 project has identified performance and manufacturability improvement points.

The Stage 3 project will extend the bench testing and refinement to include the bearings and assembly/manufacture processes for the gear system culminating in wet testing in real sea waves on a WEC test platform.

In March 2018, Ecosse Subsea Systems secured £2.5-million funding from Wave Energy Scotland (WES) to develop a magnetic gear system which could be pivotal in developing wave energy convertors.

In addition, sub-contractors for the project include Supply Design Ltd, Pure Marine Ltd and also Bathwick Electrical Design Ltd.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Research & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

23 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

23 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

25 days ago