Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Inelfe scouts Biscay Gulf interconnector advisor
Project & Tenders

October 13, 2020 · about 5 years ago

Inelfe scouts Biscay Gulf interconnector advisor

The Biscay Gulf electrical interconnection developer Inelfe has issued a tender call for advisor/broker insurance services to advise the company along the project. The scope of the services will focus on 2 phases divided into three activities. Specifically, these include probable maximum losses anal

2 minutes read
  • LinkedIn
  • X
  • Email
Biscay Gulf interconnector map

The Biscay Gulf electrical interconnection developer Inelfe has issued a tender call for advisor/broker insurance services to advise the company along the project.

The scope of the services will focus on 2 phases divided into three activities.

Specifically, these include probable maximum losses analysis to set up the minimum insurance capacity, design target insurance program CCIP/OCIP and associated contract clauses.

It also includes support on insurance issues during EPC tendering process, runinng a desk quote for OCIP and/or umbrella program and optionally act as broker for such program or control contractors insurance deployment.

The Biscay Gulf interconnector between Spain and France is a joint project developed by Inelfe on behalf of Réseau Transport d’Electricité (RTE) and Red Eléctica de España (REE).

The interconnector consists of the construction of a 2GW link. This link comprises two circuits rated 1GW each for DC operating voltage of 400 kV, comprised of 4 power cables, 4 converter station terminals located close to 400 kV Cubnezais substation (France) and Gatica substation (Spain).

The length of the route is approximately 400 kilometers starting in Spanish Pais Vasco region (near Bilbao) to an ending point in Nouvelle Aquitaine (Gironde department, near Bordeaux).

The interconnection comprises underground cables with total approximate route length of 100 kilometres as well as submarine cables with total approximate route length of 300 kilometres.

Prysmian , Nexans and potentially other cable suppliers are in play for cabling works.

Inelfe plans to keep the tender open until 30 October 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & TendersRules & RegulationTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

13 days ago

A jack-up rig
Authorities & Government

Borr Drilling’s Mexican JV closer to being five rigs richer as sale clears regulatory hurdle

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

13 days ago
A jack-up rig
Authorities & Government

Borr Drilling’s Mexican JV closer to being five rigs richer as sale clears regulatory hurdle

13 days ago