The International Marine Contractors Association (IMCA) has published the new ‘Code of Practice for Offshore Pipeline and Umbilical Installation Systems’.
The new Code of Practice includes all equipment required to lay the product safely and effectively in an offshore marine environment. It is applicable to all types of vessels that lay pipelines and umbilicals in an offshore environment; and addresses the unnecessary and potentially harmful tendency to apply overloads as part of system acceptance protocols on a project by project basis, rather than to utilise recent available and verifiable test records.
