Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›NKT repairs Norway-Denmark power link
Cabling

October 22, 2020 · about 5 years ago

NKT repairs Norway-Denmark power link

NKT has repaired the Skagerrak 1 and 2 cable systems between Norway and Denmark. The national power grids between Denmark and Norway connect through four HVDC-links crossing the Skagerrak strait. Combined they have the capability to carry 1,700 MW of energy between the two countries. Following the d

1 minutes read
  • LinkedIn
  • X
  • Email
NKT repairing cable link between Norway and Denmark
Courtesy: NKT

NKT has repaired the Skagerrak 1 and 2 cable systems between Norway and Denmark.

The national power grids between Denmark and Norway connect through four HVDC-links crossing the Skagerrak strait.

Combined they have the capability to carry 1,700 MW of energy between the two countries.

Following the damage on the Skagerrak 1 and 2, the Norwegian grid operator Statnett hired NKT to repair the 250 kV MI-insulated HVDC power cables.

The operation wrapped up by mid-October, bringing the two power cable connections back in operation as a result.

Statnett carried out the cut-and-seal operation and deburial.

NKT performed all other repair activities.

A third-party construction vessel Olympic Zeus converted into a cable repair vessel by mobilizing NKT’s cable handling system.

Additionally, NKT delivered the repair joint kits, performed the jointing, and cable burial.

Axel Barnekow Widmark , executive vice president and Head of Service in NKT, also said:

“Time and accuracy are crucial for the success of power cable service operations to minimize the down time of the cable connections essential for the exchange of energy between countries. Once again, we demonstrate that we are quick and efficient when mobilizing our skilled repair team and with our pool of pre-engineered vessels, we have one of the shortest mobilization times in the industry.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingSubseaInfrastructureOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free