Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Olympic Commander deployed for inter-array cables O&M at Sandbank OWF
Business Developments & Projects

November 25, 2020 · about 5 years ago

Olympic Commander deployed for inter-array cables O&M at Sandbank OWF

The multi-purpose offshore vessel Olympic Commander has been contracted by JDR Cables to support a maintenance campaign at the Sandbank offshore wind farm in the German North Sea. Equipped with a 28-metre Safeway Seagull walk-to-work gangway system, the vessel has been deployed to carry out the tran

1 minutes read
  • LinkedIn
  • X
  • Email
The Safeway gangway on board Olympic Commander vessel docking on a Sandbank offshore wind turbine

The multi-purpose offshore vessel Olympic Commander has been contracted by JDR Cables to support a maintenance campaign at the Sandbank offshore wind farm in the German North Sea.

Equipped with a 28-metre Safeway Seagull walk-to-work gangway system, the vessel has been deployed to carry out the transfer of people and goods at the offshore wind farm.

Within the maintenance project, which started in September, Olympic Commander is providing access for JDR technicians maintaining the inter-array cables between the offshore substation and the wind farm’s 72 Siemens Gamesa wind turbines.

The cables also contain an optical fiber that allows for the data exchange between each wind turbine and the OSS, and for the remote control and surveillance of the wind farm from Vattenfall’s Control Center in Esbjerg, Denmark.

The 288 MW Sandbank offshore wind farm, located 90 kilometres west of the island of Sylt in the German part of the North Sea, has been in operation since 2017.

The wind farm is the second joint project between Vattenfall and Stadtwerke München, who had already jointly built the DanTysk wind farm before building Sandbank.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & MaintenanceVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago