Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Second Russian pipelayer arrives at Nord Stream 2 construction site
Business Developments & Projects

December 11, 2020 · about 5 years ago

Second Russian pipelayer arrives at Nord Stream 2 construction site

A Russian pipe-laying vessel Fortuna has arrived at the construction site of the Nord Stream 2 gas pipeline in the Baltic Sea

2 minutes read
  • LinkedIn
  • X
  • Email
Fortuna; Source: Verdijk Maritiem Nord Stream 2

A Russian pipe-laying vessel Fortuna has arrived at the construction site of the Nord Stream 2 gas pipeline in the Baltic Sea

This is the second time a pipelayer arrived at the construction site in the last week. Pipe-laying vessel Akademik Cherskiy arrived at the site north of Germany and Poland but has since moved away and is located near Kaliningrad.

Reuters said in an article that the Fortuna arrived at the Nord Stream 2 site on Friday with work on the project set to resume. According to AIS data, there are also several procurement vessels near the site.

Gazprom and Nord Stream 2 AG did not announce which vessel would lay the pipes and when exactly works to construct the pipeline, which will run from Russia to Europe across the Baltic Sea, would restart. The only info announced by Gazprom was that the pipe-laying work would resume on the stalled 2.6-kilometre part before the end of 2020.

Work on the pipeline was halted last December when pipe-laying company Allseas suspended operations after U.S. sanctions targeted companies providing vessels to lay the pipes.

The potential resumption of activity comes after outgoing U.S. President Donald Trump , whose administration has staunchly opposed the pipeline, lost to president-elect Joe Biden in the presidential election earlier this month.

To remind, the U.S. ambassador to Berlin recently called on the German government and the European Union to put a temporary halt to construction work on the pipeline to send a signal to Moscow.

The pipeline, which Washington says compromises European energy security, has become a major bone of contention between Russia and the West and the relations between the two sunk to post-Cold War lows.

The $11 billion Nord Stream 2 project, led by Russian state energy company Gazprom and aimed at doubling the existing Nord Stream pipeline’s capacity, is more than 90 per cent complete. There are five other partners in the project – Uniper, Wintershall Dea, Shell, OMV, and Engie.

The construction of the 1,230-kilometre pipeline is nearly finished, the small section in Germany currently under contention needs to be completed as well as the final stretch of about 120 kilometres in Danish waters.

The project is designed as two parallel 48-inch lines, roughly 1,200 kilometres long, each starting southwest of St. Petersburg and ending at German coast, Greifswald. It is designed to boost the amount of Russian gas that can be shipped to Europe without having to go through Ukraine.

The gas pipelines will have the capacity to transport 55 billion cubic meters (bcm) of Russian gas a year to the EU, for at least 50 years.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInfrastructureProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago