Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›HR Wallingford delivers mWave CFD simulations
Business Developments & Projects

December 15, 2020 · about 5 years ago

HR Wallingford delivers mWave CFD simulations

UK-based civil engineering and environmental hydraulics organisation HR Wallingford has conducted computational fluid dynamics (CFD) simulations which helped Bombora finalize the design of its mWave wave energy device.

1 minutes read
  • LinkedIn
  • X
  • Email
Image of mWave under CFD simulations (Courtesy of HR Wallingford)

UK-based civil engineering and environmental hydraulics organisation HR Wallingford has conducted computational fluid dynamics (CFD) simulations which helped Bombora finalize the design of its mWave wave energy device.

HR Wallingford generated a numerical model of Bombora Wave Power’s mWave device in 2018 and performed CFD simulations to calculate wave forces acting on it.

The results informed the design of an mWave demonstrator prototype, which converts wave power to electricity, and will be tested at full-scale for the first time off the Welsh coast in 2021.

HR Wallingford’s work formed part of Bombora’s broader numerical modelling and small-scale physical testing program to define design loads for the demonstrator mWave.

The simulations tested mWave under seven wave conditions – from ‘normal’ to extreme wave climates – using the modified version of the open-source CFD model OpenFOAM, according to HR Wallingford.

This content is available after accepting the cookies.

Assessing wave loadings before field testing is vital for improving the performance, resilience and survivability of mWave under a range of conditions.

mWave’s modular design is an innovative rubber membrane cell module structure, which can easily scale up.

Bombora’s 1.5MW Pembrokeshire Demonstrator Project, which is supported by a £13.4 million European Regional Development Grant through Welsh Government, will showcase the potential of the technology for use in large-scale marine renewable energy projects.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & MaintenanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago