Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›TechnipFMC picks Oceaneering connectors for GoM tieback project
Equipment

December 16, 2020 · about 5 years ago

TechnipFMC picks Oceaneering connectors for GoM tieback project

Oceaneering has won a connector supply contract from TechnipFMC to provide 2-inch M5 connectors and chemical throttle valves (CTV) for the Khaleesi/Mormont and Samurai tieback project located in the U.S. Gulf of Mexico. The M5 connector enables injection of gas or chemicals into subsea infrastructur

1 minutes read
  • LinkedIn
  • X
  • Email
Oceaneering connector

Oceaneering has won a connector supply contract from TechnipFMC to provide 2-inch M5 connectors and chemical throttle valves (CTV) for the Khaleesi/Mormont and Samurai tieback project located in the U.S. Gulf of Mexico.

The M5 connector enables injection of gas or chemicals into subsea infrastructure. It also serves as an access point for future subsea field intervention activities. These include gas lift, chemical injection, well stimulation, hydrate remediation, flooding and venting operations, acid injection and scale squeeze.

Oceaneering Rotator CTVs regulate the flow of chemicals – scale, wax, and corrosion inhibitors, for example – delivered to subsea production systems. Their functions are diverse, from flow control to metering and highly accurate dosing. CTVs effectively eliminate the need for topside injection as well as dedicated umbilical lines.

Nuno Sousa , VP, Manufactured Products, Energy, said:

“We appreciate TechnipFMC’s trust in our ability to provide them with compact, reliable, cost-effective, and field-proven subsea connector and chemical metering hardware solutions. This contract demonstrates that the industry is confident in the reliability of our products.”

Specifically, the Samurai and Khaleesi/Mormont fields will be tied back to the King’s Quay FPS in the GoM.

Murphy Oil holds a 50 per cent stake in King’s Quay FPS, while the remaining interest goes to private equity firm Ridgewood Energy Corporation.

Finally, the King’s Quay FPS should go into service in mid-2022, with Murphy serving as operator.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentInfrastructure

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

19 days ago

‘UK’s largest-ever’ electricity transmission project in major construction phase
Business & Finance

‘UK’s largest-ever’ electricity transmission project in major construction phase

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

19 days ago
‘UK’s largest-ever’ electricity transmission project in major construction phase
Business & Finance

‘UK’s largest-ever’ electricity transmission project in major construction phase

19 days ago