Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›SSEN taps NBO for new Skye and Harris subsea cable
Cabling

December 22, 2020 · about 5 years ago

SSEN taps NBO for new Skye and Harris subsea cable

Ningbo Orient Cable (NBO) said it has secured a contract from Scottish and Southern Electricity Networks (SSEN) Distribution to manufacture the cable for the Skye – Harris subsea cable replacement project. SSEN recently confirmed its decision to proceed with replacement of the 33kV cable which runs

1 minutes read
  • LinkedIn
  • X
  • Email
SSEN logo
Courtesy: SSEN

Ningbo Orient Cable (NBO) said it has secured a contract from Scottish and Southern Electricity Networks (SSEN) Distribution to manufacture the cable for the Skye – Harris subsea cable replacement project.

SSEN recently confirmed its decision to proceed with replacement of the 33kV cable which runs from Ardmore, Skye to Beacravik, Harris.

Specifically, On 16 October SSEN received an alert to a fault on its network which temporarily interrupted power supplies to 13,600 customers on Lewis and Harris.

Related Articles

Cabling

SSEN needs to set up new power link for Lewis and Harris

2 min read

Investigations confirmed a fault on the 32-kilometre cable around 15 kilometres from the shore on Skye.

Based on the depth of the water at the fault location (over 100 metres), SSEN ruled out the repair option, and went for a full cable replacement .

SSEN expects that the replacement cable will be operational by end August 2021.

The replacement 33kV cable, which will provide increased capacity of between 8 and 10MW compared to the existing link, should arrive in the UK in late May.

The decision to proceed with the replacement at 33kV also avoids up to 200,000 tonnes of CO2 emissions from the back-up stations during the timescale projected for larger cable option.

In addition, NBO said that a special cable design will be applied for the condition with water depth of 200 metres.

NBO has not disclosed the financial details of the contract.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingSubseaInfrastructureProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free