Greece and Italy will be looking to build a new subsea power interconnector with up to 1GW capacity, Greek grid operator IPTO said in its 2022-2031 preliminary development plan.
IPTO and its Italian equivalent Terna recently teamed up to prepare studies to strengthen the interconnection of the two electrical systems.
