Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›MDL executes SURF decom project with Helix
Equipment

January 21, 2021 · about 5 years ago

MDL executes SURF decom project with Helix

Back-deck equipment specialist Maritime Developments MDL has completed a SURF decommissioning project in the UKCS for Helix Robotics Solutions. The work scope covered the retrieval of 7 cables, umbilicals, flowlines and jumpers connected to an FPSO in the UK North Sea, using an MDL equipment spread

1 minutes read
  • LinkedIn
  • X
  • Email
MDL equipment spread for SURF decommissioning campaign in the UKCS

Back-deck equipment specialist Maritime Developments MDL has completed a SURF decommissioning project in the UKCS for Helix Robotics Solutions.

The work scope covered the retrieval of 7 cables, umbilicals, flowlines and jumpers connected to an FPSO in the UK North Sea, using an MDL equipment spread operated by the company’s expert technicians.

The MDL spread comprised of a second-generation reel drive system, TTS-4/140 Series Tensioner and deck deflectors onboard the Skandi Acergy .

The spread was used for spooling of the product under tension onto two installation reels, also supplied by MDL.

The two reels are now available for hire, following the subsequent onshore transpooling of the product for disposal.

Paul Marshall , MDL project engineer, said:

“This was our first mission with Helix, and I hope that the experiences on this job are a solid base for a successful working relationship going forward.

“The challenges on this project revolved around the age and fragility of the products, moving schedules, as well as Covid-related personnel restrictions. We worked closely with the client to optimise the execution of the on-board operations, including change to tensioner squeeze settings and pads changeouts to suit the different products.”

MDL pipe lay and retrieval equipment spreads are fully customisable to individual project requirements and vessel back decks, supported by MDL in-house Project Management & Engineering team for optimised equipment selection, deck plans and sea-fastening designs.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentInfrastructureOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

19 days ago

‘UK’s largest-ever’ electricity transmission project in major construction phase
Business & Finance

‘UK’s largest-ever’ electricity transmission project in major construction phase

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

19 days ago
‘UK’s largest-ever’ electricity transmission project in major construction phase
Business & Finance

‘UK’s largest-ever’ electricity transmission project in major construction phase

19 days ago