Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Santos gearing up for new well offshore Australia
Authorities & Government

January 26, 2021 · about 5 years ago

Santos gearing up for new well offshore Australia

Santos has filed an environmental plan for exploration drilling of the Dancer-1 well, located offshore Australia, to Australian authorities.

2 minutes read
  • LinkedIn
  • X
  • Email
Dancer-1 well location - Santos

Australian oil and gas giant Santos has filed an environmental plan for exploration drilling of the Dancer-1 well, located offshore Australia, to Australian authorities and the plan is now under assessment.

Under the plan, Santos proposes to undertake a single-well exploration drilling campaign in permit area WA-1-P, targeting a gas reservoir in the Legendre formation.

The permit area is within offshore Commonwealth waters in water depths of approximately 63 metres.

The drilling activity will be carried out using a jack-up mobile offshore drilling unit (MODU) with support vessels and helicopters.

A sidetrack or re-spud is not planned as part of the activity but is included as a contingency.

This Environment Plan (EP) covers drilling activities and all MODU, vessel and helicopter operations within the operational area.

A Petroleum Safety Zone (PSZ) of 500 m radius established around the well location. The well will be drilled within an operational area measuring 2 km x 2 km square.

In the event of a re-spud, the new well location would remain within the operational area.

Drilling activities are planned for approximately 30 days. However, contingency (up to 75 days) is provided to account for unfavourable weather, additional drilling (e.g. a re-spud) or operational challenges.

Drilling is planned to start in 4Q 2021 and the EP remains valid until the end of 2022.

The MODU will be typically supported by two vessels, with a maximum of four accounted for in this EP. The support vessels are yet to be confirmed. The vessels will be either stationary or operating at slow speeds while undertaking activities within the operational area.

The well will only use water-based drilling fluids and no well testing to the surface (i.e. flowing hydrocarbon to the surface and flaring) is planned.

Downhole formation evaluation will be performed which may include wireline logging, Vertical Seismic Profiling and coring. After completion of the drilling activity, the well will be plugged and abandoned (P&A).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness & FinanceBusiness Developments & ProjectsEnvironmentExploration & ProductionRegulation & Policy

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago