Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Niestern Sander hits milestone in Münsterland LNG conversion
Infrastructure

January 29, 2021 · about 5 years ago

Niestern Sander hits milestone in Münsterland LNG conversion

The Royal Niestern Sander shipyard has completed the installation of the new aft ship with LNG tank and equipment on the AG Ems’ passenger ferry Münsterland.

2 minutes read
  • LinkedIn
  • X
  • Email
Niestern Sander hits milestone in Münsterland LNG conversion

The Royal Niestern Sander shipyard has completed the installation of the new aft ship with LNG tank and equipment on the AG Ems’ passenger ferry Münsterland.

Münsterland , the passenger ship belonging to German ferry operator AG Ems originating from 1986, has been upgraded with a completely newly designed and built aft ship.

The new aft ship contains dual-fuel engines, LNG storage tanks, propulsion systems, all LNG installations, pipelines and other systems.

Last week, Münsterland had arrived at the dock and earlier this week the old aft ship has been removed. The old aft ship was transported on a pontoon to Groningen for recycling.

With the same pontoon, the aft ship was transported from the inner-dike location to the dock location. Upon arrival, the new stern with modular trailers was driven from the pontoon into the dock and placed in position behind the Münsterland.

Due to both shipbuilding and ship repair activities at Niestern Sander taking place, the majority of the conversion operation was executed physically at the shipbuilding yard. The repair dock is not yet necessary.

In the coming period, the new aft ship will be installed on the existing ship.

As a result of the LNG conversion, the new form of the ship will enjoy emission benefits, reduced hull resistance, and less engine power needed to sail at the same speed.

AG Ems is expected to put Münsterland back into service in its new LNG form in the summer of 2021.

This project by Niestern Sander has been contributed to by the European Regional Development Fund of the European Union.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

19 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

19 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

19 days ago