Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›TechnipFMC picks up Karish risers
Equipment

February 8, 2021 · about 5 years ago

TechnipFMC picks up Karish risers

TechnipFMC pipelay vessel Deep Blue has recently completed spooling of Energean’s Karish steel catenary risers at its spoolbase in Mobile, Alabama. The Deep Blue is currently transiting to Limassol, Cyprus where it will perform mobilisation of the riser end structures. TechnipFMC won an integrated e

2 minutes read
  • LinkedIn
  • X
  • Email
Karish field risers on Deep Blue vessel

TechnipFMC pipelay vessel Deep Blue has recently completed spooling of Energean’s Karish steel catenary risers at its spoolbase in Mobile, Alabama.

The Deep Blue is currently transiting to Limassol, Cyprus where it will perform mobilisation of the riser end structures.

TechnipFMC won an integrated engineering, procurement, construction and installation (iEPCI) contract for the Karish development offshore Israel in March 2018.

The execution of the iEPCI contract covers the design, procurement, construction and installation of the complete subsea system, a floating production storage and offloading unit (FPSO) specifically designed to allow the subsequent tie-back of the Tanin field, the pipeline system, and the onshore pipeline and valve station at the receiving station.

In June last year, TechnipFMC completed pipe laying works and subsea systems installation on Energean’s Karish.

This content is available after accepting the cookies.

In October, offshore contractor Jumbo also completed Karish mooring work, including transport and installation of 14 suction piles – part of the FPSO mooring system; a tie-in manifold; as well as a 24-inch deepwater gas sales spool.

Furthermore, the company installed the components at a depth of 1,760 metres, setting its new deep-water installation record .

The work is scheduled to recommence in 2021, with the hook-up and also installation of the Energean Power FPSO.

Energean Power FPSO is now 93 per cent complete in the Admiralty Yard, Singapore.

Recent report from Energean said that first gas from its Israeli fields could start flowing in Q1 2022. Initial target was around year-end 2021.

The company reported that the Karish project was approximately 87 per cent complete as of 31 December 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentInfrastructurePorts & LogisticsStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

11 days ago