Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Port of Nigg chosen for Seagreen OWF foundation installation
Infrastructure

February 10, 2021 · about 5 years ago

Port of Nigg chosen for Seagreen OWF foundation installation

Global Energy Group’s (GEG) Port of Nigg has been selected as the marshalling, storage and logistics base for 114 wind turbine foundations for the 1,075 MW Seagreen offshore wind farm. GEG has been awarded a contract for the project by Seaway 7, the EPCI contractor for Seagreen’s foundations and int

1 minutes read
  • LinkedIn
  • X
  • Email
Foundation marshalling activities at the Port of Nigg

Global Energy Group’s (GEG) Port of Nigg has been selected as the marshalling, storage and logistics base for 114 wind turbine foundations for the 1,075 MW Seagreen offshore wind farm.

GEG has been awarded a contract for the project by Seaway 7, the EPCI contractor for Seagreen’s foundations and inter-array cables, on behalf of the developers SSE Renewables and Total.

Foundation installation at the project site in Scotland’s Firth of Forth is expected to commence in the second half of 2021 and last for twelve months, with 141 skilled jobs to be supported at Port of Nigg during peak construction: 93 permanent roles already on-site and an additional 48 new roles at the port. GEG will start recruitment for the new roles at Port of Nigg in the coming months.

The 114 jacket foundations – manufactured by Lamprell , COOEC-Fluor Heavy Industries and Jutal Offshore Oil Services – will be delivered to the port on board Heavy Transport Vessels (HTVs) and then transported to the project site in the North Sea for installation.

The 1,075 MW offshore wind farm, located 27 kilometres off the coast of Angus, will feature 114 MHI Vestas 10 MW wind turbines, scheduled to be put into operation in 2022/2023.

Once operational, the project will become Scotland’s largest offshore wind farm, providing enough green energy to power more than 1.6 million homes and displacing over 2 million tonnes of carbon dioxide every year.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructurePorts & LogisticsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

17 days ago

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

17 days ago
WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

17 days ago