Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›JAPEX suspends Soma LNG terminal ops following earthquake
Business Developments & Projects

February 15, 2021 · about 5 years ago

JAPEX suspends Soma LNG terminal ops following earthquake

Japan Petroleum Exploration (JAPEX) has shut down its Soma LNG facility following a 7.3 magnitude earthquake.

2 minutes read
  • LinkedIn
  • X
  • Email
JAPEX suspends Soma LNG terminal ops following earthquake

Japan Petroleum Exploration (JAPEX) has shut down its Soma LNG facility following a 7.3 magnitude earthquake.

The earthquake struck off the coast of Fukushima on February 13, the company said.

The Soma LNG “terminal operation has been suspended for safety confirmation, and the supply of LNG managed at the terminal has also been suspended”, the company’s statement reads.

“We are currently assessing the facilities’ damage, and timing to resume operations are not yet determined,” JAPEX said.

There has been no damage to the surrounding area, such as gas leakage from the terminal. Due to the suspension of supply operations immediately after the earthquake, BOG (boil-off gas), the vaporized gas from LNG stored in the LNG storage tanks, is being burned as a measure to release the gas safely. By taking these measures, flames are being emitted from the flare stack, but there are no safety issues at the terminal or the surrounding area.

JAPEX added that its ten domestic oil and gas fields are continuing normal production operations, and the gas produced is supplied to the gas pipeline network as usual.

However, with the suspension of operations at the Soma LNG terminal, the Fukushima natural gas fired power plant suspended operations.

The power generation facilities were automatically shut down after the earthquake and are still inactive. Fukushima Gas Power is currently inspecting the facilities in the power plant.

The resumption of operations at the power plant is in close connection to the resumption of operations at the Soma LNG facility, and has not been determined yet.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago