Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Christophe de Margerie finalising first NSR transit in February
Infrastructure

February 19, 2021 · about 5 years ago

Christophe de Margerie finalising first NSR transit in February

Russian shipowner Sovcomflot’s arctic LNG tanker is transiting the eastern sector of the Northern Sea Route accompanied by an icebreaker on the experimental round trip voyage from Sabetta, Russia to Jiangsu, China.

2 minutes read
  • LinkedIn
  • X
  • Email
Christophe de Margerie finalising the round trip voyage

Russian shipowner Sovcomflot’s arctic LNG tanker is transiting the eastern sector of the Northern Sea Route accompanied by an icebreaker on the experimental round trip voyage from Sabetta, Russia to Jiangsu, China.

This is the first time a large-tonnage cargo ship has made such a voyage in February since transit navigation in the east part of the Arctic lasts from July to November.

Christophe de Margerie , the 172,600 cubic metres LNG tanker, is navigating the NSR accompanied by the 23,439 gross tonnage Russian nuclear-powered icebreaker 50 Let Pobedy going west from Cape Dezhnev. 50 Let Pobedy was built in 2007, while Christophe de Margerie was made in 2017 and chartered to the Novatek’s Yamal LNG project.

This content is available after accepting the cookies.

Christophe de Margerie set sail from Sabetta on 5 January and transited the Northern Sea Route with icebreaker assistance within eleven days. After discharging the LNG cargo in Jiangsu, the vessel started on a return trip on 27 January.

On 7 February, the ship entered the eastern end of the Northern Sea Route at Cape Dezhnev, where it met the nuclear icebreaker 50 Let Pobedy to escort it back through the ice to Sabetta.

On 16 February, the time of the report, the two vessels were approaching the Vilkitsky Strait in the Laptev Sea. The convoy is expected to arrive at Sabetta in the Kara Sea today.

President and CEO of Sovcomflot Igor Tonkovidov said: “The current voyage of Christophe de Margerie significantly expands the navigation window in the in the eastern sector of the Russian Arctic, and confirms that year-round safe navigation is possible along the entire length of the Northern Sea Route… From 2023 to 2025, the company plans to take delivery of 18 new-generation icebreaking LNG carriers to service the Arctic LNG 2 project.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

19 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

19 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

19 days ago