Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›JAPEX resumes full operation at Soma LNG
Business Developments & Projects

February 22, 2021 · about 5 years ago

JAPEX resumes full operation at Soma LNG

Japan Petroleum Exploration (JAPEX) said it has continued the supply of regasified natural gas from Soma LNG terminal to the adjacent Fukushima power plant.

1 minutes read
  • LinkedIn
  • X
  • Email
JAPEX resumes full operation at Soma LNG

Japan Petroleum Exploration (JAPEX) said it has continued the supply of regasified natural gas from Soma LNG terminal to the adjacent Fukushima power plant.

To remind, both facilities have been shut down due to a 7.3 magnitude earthquake that hit Japan on February 13.

With the resumption of natural gas supply from the Soma LNG terminal, Fukushima power plant, owned by Fukushima Gas Power, also resumed operation.

JAPEX noted that operations have sequentially been resuming as safety was confirmed through inspections, restoration measures and trial runs.

The company initially resumed supply of regasified LNG to the gas pipeline network and LNG trucks on February 16.

With the confirmation of the safety on related facilities at the terminal, the supply of LNG regasified gas for power generation to the power plant resumed on February 19.

As a result of checks and inspections conducted by FGP after the automatic shutdown of the power generation facilities following the earthquake, there was no damage to the facilities that would interfere with the power plant’s operation.

With the resumption of fuel supply from the Soma LNG terminal, the power plant resumed operation on February 19 as well, for both Unit No.1 and No.2.

To remind, the Soma LNG facility has the capacity to handle 7 mtpa of LN, while the Fukushima natural gas power plant has a production capacity of 1.18 million KW.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago