Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›JAPEX resumes full operation at Soma LNG
Clean Fuel

February 22, 2021 · about 5 years ago

JAPEX resumes full operation at Soma LNG

Japan Petroleum Exploration (JAPEX) said it has continued the supply of regasified natural gas from Soma LNG terminal to the adjacent Fukushima power plant.

1 minutes read
  • LinkedIn
  • X
  • Email
JAPEX resumes full operation at Soma LNG
Courtesy of JAPEX

Japan Petroleum Exploration (JAPEX) said it has continued the supply of regasified natural gas from Soma LNG terminal to the adjacent Fukushima power plant.

To remind, both facilities have been shut down due to a 7.3 magnitude earthquake that hit Japan on February 13.

With the resumption of natural gas supply from the Soma LNG terminal, Fukushima power plant, owned by Fukushima Gas Power, also resumed operation.

JAPEX noted that operations have sequentially been resuming as safety was confirmed through inspections, restoration measures and trial runs.

The company initially resumed supply of regasified LNG to the gas pipeline network and LNG trucks on February 16.

Related Articles

Clean Fuel

JAPEX partially resumes Soma LNG ops

2 min read

With the confirmation of the safety on related facilities at the terminal, the supply of LNG regasified gas for power generation to the power plant resumed on February 19.

As a result of checks and inspections conducted by FGP after the automatic shutdown of the power generation facilities following the earthquake, there was no damage to the facilities that would interfere with the power plant’s operation.

With the resumption of fuel supply from the Soma LNG terminal, the power plant resumed operation on February 19 as well, for both Unit No.1 and No.2.

To remind, the Soma LNG facility has the capacity to handle 7 mtpa of LN, while the Fukushima natural gas power plant has a production capacity of 1.18 million KW.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelLNGBusiness Developments & ProjectsOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free