Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Santos gets green light for Archer 3D seismic
Fossil Energy

March 5, 2021 · about 5 years ago

Santos gets green light for Archer 3D seismic

Australia’s offshore energy regulator NOPSEMA has accepted Santos’ proposal to acquire a 3D marine seismic survey in the Bedout Sub-basin on the central North West Shelf called the Archer 3D MSS. The Archer 3D MSS is located within exploration permit areas WA-437-P and WA-541-P, and surrounding wate

1 minutes read
  • LinkedIn
  • X
  • Email
Archer Seismic Survey map
Courtesy: NOPSEMA/Santos

Australia’s offshore energy regulator NOPSEMA has accepted Santos’ proposal to acquire a 3D marine seismic survey in the Bedout Sub-basin on the central North West Shelf called the Archer 3D MSS.

The Archer 3D MSS is located within exploration permit areas WA-437-P and WA-541-P, and surrounding waters.

The 3D seismic data should help Santos develop regional geologic models to inform the exploration permit retention strategy and the potential location of future drilling of exploration and development wells.

According to Santos environmental plan (EP), the survey operational area is located approximately 102 kilometres from the town of Port Hedland.

Related Articles

LNG

Santos files plan for Archer 3D seismic survey

2 min read

Data acquisition will be via methods and procedures similar to other seismic surveys conducted in Australian waters, using streamer-towing seismic survey vessel.

Santos intends to acquire the full survey in 2021. However, should this not be achievable, the full survey may be acquired in 2022.

The timing of the survey is also dependent upon vessel availability, weather conditions, stakeholder consultation feedback, the receipt of the required statutory approvals and the control measures within the EP.

Furthermore, the Archer 3D seismic survey will only take place between 1 February to 31 July in either 2021 or 2022.

The survey will take at least 38 days to complete, with operations occurring on a 24-hour basis.

Operational area is approximately 4,752 square kilometres, with water depths ranging from some 63 metres to 106 metres.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergySeismicSubseaAuthorities & GovernmentEnvironmentExploration & ProductionRules & Regulation

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free