Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›EMO assumes coordination of Trianel Windpark Borkum
Operations & Maintenance

March 17, 2021 · about 5 years ago

EMO assumes coordination of Trianel Windpark Borkum

EMS Maritime Offshore’s (EMO) VENTUSmarine control center has assumed coordination of the Trianel Windpark Borkum project in Germany. In November last year, EMO signed a five-year contract with Trianel Windpark Borkum GmbH & Co. to handle maritime, flight and emergency coordination for the project u

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier

EMS Maritime Offshore’s (EMO) VENTUSmarine control center has assumed coordination of the Trianel Windpark Borkum project in Germany.

In November last year, EMO signed a five-year contract with Trianel Windpark Borkum GmbH & Co. to handle maritime, flight and emergency coordination for the project until the end of 2025.

EMO currently transports personnel and freight to the 72 turbines located 45 km north of the island Borkum using the service vessel WINDEA Three.

WINDEA Three began the three-year charter in February 2020, succeeding its sister vessel WINDEA One which operated on the project since 2013.

“We are proud to continue working with Trianel in the area of marine coordination, and we are pleased with the trust and confidence with which our efforts have been met. Our team has been monitoring “Trianel Windpark Borkum” since the facility was first constructed,” said Jan Heyenga , Head of the maritime services division at EMO.

Trianel Windpark Borkum was built in two phases. The first 200 MW phase comprises 40 Adwen 5 MW turbines which have been operational since 2015.

The project’s second phase, which features 32 Senvion 6.2 M152 turbines, was commissioned last summer.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

16 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

16 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

16 days ago