Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Petrobras has another go at leasing Bahia LNG facilities
Clean Fuel

April 16, 2021 · about 5 years ago

Petrobras has another go at leasing Bahia LNG facilities

Brazilian state-owned oil company Petrobras has published the call for the second bidding process to lease the Bahia LNG Regasification Terminal and associated facilities.

1 minutes read
  • LinkedIn
  • X
  • Email
Petrobras has another go at leasing Bahia LNG facilities
Courtesy of Petrobras

Brazilian state-owned oil company Petrobras has published the call for the second bidding process to lease the Bahia LNG Regasification Terminal and associated facilities.

The Bahia LNG regasification terminal lease process started in the second half of 2020.

Petrobras, which kicked of the same process in February this year , is repeating the call for the second bidding round.

The company restricted the bidding to pre-qualified companies under the pre-qualification call.

Petrobras stresses this leasing is aligned with the strategy to improve its capital allocation and building a favorable environment for new investors to enter the natural gas sector.

The terminal consists of an island-type pier with all the necessary facilities for mooring a Floating Storage and Regasification Unit (FSRU) vessel directly to the pier and a supply vessel on the FSRU’s port side. The Bahia LNG’s maximum regasification flow rate is 20 million cubic metres a day.

The pipeline that is part of the terminal is 45 kilometres long and 28 inches in diameter, connecting the terminal to two delivery points, São Francisco do Conde Pressure Reducing Station and São Sebastião do Passé Flow Control Station.

The equipment for the generation and supply of electricity located at the Madre de Deus Waterway Terminal (TEMADRE) is also included in the scope of the transaction.

FSRU is not part of the leasing process.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelLNGBusiness Developments & ProjectsInfrastructureOperations & MaintenanceStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free