Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›PSA wraps up Hammerfest LNG fire investigation
Business Developments & Projects

April 22, 2021 · about 5 years ago

PSA wraps up Hammerfest LNG fire investigation

Norway’s Petroleum Safety Authority said it has concluded a lengthy investigation into the fire accident at Equinor’s Hammerfest LNG facility.

1 minutes read
  • LinkedIn
  • X
  • Email
PSA wraps up Hammerfest LNG fire investigation

Norway’s Petroleum Safety Authority said it has concluded a lengthy investigation into the fire accident at Equinor’s Hammerfest LNG facility.

The incident took place on September 28, 2020, with PSA’s investigation unveiling serious breaches of the regulations.

In its notice on Thursday, PSA issued an order to the Hammerfest LNG:

To remind, the fire at Hammerfest LNG on September 28 caused damage to the air intake on one of the plant’s five power turbines.

PSA noted that when the fire broke out, the Equinor-operated plant was being run up after a shutdown. The turbine had been shut down owing to a fault in an oil filter.

The fire caused material damage to the GTG4 air intake and filter housing and consequential damage from extinguishing work to electrical, instrumentation and mechanical equipment.

Hammerfest LNG has been shut down since the fire and is due to resume operation on 1 October 2021.

Three vessels with firewater monitors helped the extinguishing work. Without this assistance, the fire would have burnt for longer since the plant’s own firewater monitors do not cover the turbine air intake.

The probability that the fire might have spread to neighboring areas is considered to be small, but it could have caused more extensive damage to the filter and generator housings, PSA said.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago