Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Deepwater Installation›Nexans umbilicals for Equinor’s Bacalhau field
Deepwater Installation

May 19, 2021 · about 5 years ago

Nexans umbilicals for Equinor’s Bacalhau field

Nexans has won a contract to supply the umbilicals for Equinor’s Bacalhau ultra-deepwater oil project offshore Brazil. Nexans will design, manufacture and supply a total of 44 kilometers of gas-lift, static and dynamic steel tube umbilicals for installation at water depths reaching 2,100 meters. Thi

1 minutes read
  • LinkedIn
  • X
  • Email
Nexans umbilicals for Equinor's Bacalhau field
Nexans

Nexans has won a contract to supply the umbilicals for Equinor’s Bacalhau ultra-deepwater oil project offshore Brazil.

Nexans will design, manufacture and supply a total of 44 kilometers of gas-lift, static and dynamic steel tube umbilicals for installation at water depths reaching 2,100 meters.

This includes 2.5 kilometers of gas-lift umbilical, 35 kilometers of static umbilical, 6.9 kilometers of dynamic umbilical and accessories.

The contract was secured with Subsea Integration Alliance (SIA), which is responsible for the subsea, umbilical, risers, and flowlines (SURF) front-end engineering and design (FEED) contracts for the Bacalhau project.

Nexans’s specialized facility in Halden, Norway, is expected to deliver the steel tube umbilicals in Q4 2022.

Related Articles

Fossil Energy

CGG lands OBN survey job at Bacalhau field

1 min read

Equinor is the operator of the Bacalhau field with a 40 per cent stake, while ExxonMobil and Petrogal hold 40 and 20 per cent each. Pré-sal Petróleo, a non-investor Government agency, is also a partner in the field.

The field, located 185 km from the coast of Ilhabela/SP, is slated for first oil production in 2024.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Deepwater InstallationFossil EnergyOil & GasSubseaEquipmentProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free