Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Uncrewed surface vessel starts survey at UK offshore wind farm
Offshore Wind

July 19, 2021 · about 5 years ago

Uncrewed surface vessel starts survey at UK offshore wind farm

A remotely operated uncrewed surface vessel (USV) has been deployed for a hydrographic survey on an operational offshore wind farm in the UK.

2 minutes read
  • LinkedIn
  • X
  • Email
XOCEAN's Uncrewed Surface Vessel near offshore wind turbines
XOCEAN; Illustration

A remotely operated uncrewed surface vessel (USV) has been deployed for a hydrographic survey on an operational offshore wind farm in the UK.

After several tasks off the UK coasts this year, including on the operational Greater Gabbard and Hornsea One offshore wind farms, as well as the Berwick Bank and Marr Bank sites off Scotland, an XOCEAN USV has now been deployed on the Thanet offshore wind farm.

The USV was mobilised on 19 July from Ramsgate Harbour in Kent, where it will transit to and from the the offshore wind farm while performing a hydrographic survey until 26 July.

The 300 MW Thanet, built by Vattenfall in 2010, consists of 100 Vestas V90 wind turbines, installed in water depths of 20–25 metres approximately 12 kilometres off Foreness Point, the easternmost part of Kent.

In January 2020, XOCEAN’s USV carried out survey work at the Greater Gabbard offshore wind farm , located 23 kilometres off the UK coast, representing a first operation of this kind in the offshore wind sector.

On Greater Gabbard, the XO-450 USV conducted seabed surveys on seven of the project’s 140 turbines.

This April, the company’s USV completed a survey at the Hornsea One offshore wind farm in the UK, its farthest offshore project so far.

The vessel was launched and recovered from shore, 120 kilometres from the offshore surveying location and conducted its offshore operation in three-and-a-half-days.

Related Articles

Offshore Wind

XOCEAN’s uncrewed surface vessel ventures far offshore

2 min read

Last month, two XOCEAN uncrewed surface vessels were deployed for work at Berwick Bank and Marr Bank offshore wind farm sites in Scotland, where they performed multiple nearshore and offshore cable route surveys in water depths ranging from zero to 60 metres.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindSubseaSurveys & InterventionsWind FarmsBusiness Developments & ProjectsTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free