Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Green Marine›World’s 1st all-electric container terminal completed
Green Marine

August 23, 2021 · about 5 years ago

World’s 1st all-electric container terminal completed

The Port of Long Beach, the second-busiest container port in the United States, has completed “the world’s first all-electric container terminal” at Middle Harbor.

2 minutes read
  • LinkedIn
  • X
  • Email
Port of Long Beach
Port of Long Beach

The Port of Long Beach, the second-busiest container port in the United States, has completed “the world’s first all-electric container terminal” at Middle Harbor.

As disclosed, the construction of the Long Beach Container Terminal (LBCT), which features nearly all-electric and zero-emissions equipment, started in May 2011.

The first part of the terminal opened in 2016 with the completion of phase 1, allowing the terminal to begin operations across an initial 151 acres. Phase 2 wrapped up in October 2017, expanding the facility to 191 acres.

The third and final phase concluded in July, growing the terminal to 300 acres with a completed container yard, an administration building and an on-dock rail yard designed to handle 1.1 million TEUs annually to minimize truck traffic on local roads and freeways.

Additionally, 14 ship-to-shore gantry cranes line a new, 4,200-foot-long concrete wharf capable of welcoming three massive ships at once, making the Port of Long Beach “big ship” ready into the future, according to the port.

Another 3 acres will be added in 2025 with the opening of the North Gate Expansion, completing the terminal with 303 acres.

All ships calling at the terminal plug into shore power connections while berthed, allowing them to shut down diesel engines and connect to the landside electrical grid.

“This new terminal charts a new course for greener cargo operations and strengthens our ongoing commitment to the Green Port Policy and San Pedro Bay Ports Clean Air Action Plan enacted about 15 years ago,” said Long Beach Harbor Commission President Steven Neal .

“As the world’s first all-electric, zero-emission mega terminal, LBCT sets the industry standard for moving cargo sustainably while keeping the Port competitive and supporting vital jobs,” said Mario Cordero , Executive Director of the Port of Long Beach.

All the major structures of the 1.49 billion project were built with features to save power and water, meeting strict leadership in energy and environmental design (LEED) standards, according to the port authority.

As part of its net-zero drive, the Port of Long Beach adopted in May 2021 a new amendment to its Green Ship Incentive Program, now offering “the world’s most generous sustainable vessel financial incentives.”

Related Articles

Green Marine

Port of Long Beach rewards eco ships with ‘world’s highest’ bonus

2 min read

Furthermore, together with other 18 port authorities, the port signed a declaration on the collective response to disruption, digitalisation, and decarbonisation in June 2021.

Related Articles

Green Marine

19 ports ink declaration on disruption, digitalisation and decarbonisation

3 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Green MarinePorts & Logistics

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free