Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›LNG-fueled CLdN Faustine to serve Gothenburg-Zeebrugge route
Infrastructure

December 21, 2021 · about 4 years ago

LNG-fueled CLdN Faustine to serve Gothenburg-Zeebrugge route

Luxembourg-based shipping group CLdN’s LNG-fueled newbuild CLdN Faustine will serve the route between the Port of Gothenburg and Zeebrugge, bringing environmental benefits.

2 minutes read
  • LinkedIn
  • X
  • Email
LNG-fueled CLdN Faustine to serve Gothenburg-Zeebrugge route

Luxembourg-based shipping group CLdN’s LNG-fueled newbuild CLdN Faustine will serve the route between the Port of Gothenburg and Zeebrugge, bringing environmental benefits.

On 20 December, CLdN’s newbuild vessel made its first call at the Port of Gothenburg. CLdN Faustine runs on liquefied natural gas or biogas. Today, the ship will reach Zeebrugge loaded with Swedish export goods for the first time.

This is the first of CLdN two ships with a high-pressure, two-stroke, dual-fuel propulsion system that can use LNG/LBG or diesel.

”We are investing in technologically advanced vessels to reduce climate impact, and Faustine is another step forward on our journey. She has the same capacity as her H5 sister vessels, but due to technical improvements we can optimize the cargo mix more efficiently,” said Emil Holmgren , manager at CLdN.

CLdN Faustine calls at Gothenburg Roro Terminal in the Port of Gothenburg. It will serve CLdN’s existing traffic between Gothenburg and Zeebrugge. This is an important destination for Swedish trade with Central Europe.

”The importance of Belgian traffic for Swedish foreign trade can not be underestimated and it is very positive that CLdN continues to invest in a new, modern, efficient vessel with good environmental performance,” said Jacob Minnhagen from the Gothenburg Port Authority.

The port has a long-term strategy to make alternative fuels more available to ships calling at the port. LNG and LBG are some examples, while methanol is another.

The port has also started a feasibility study together with the Norwegian energy company Statkraft. The goal is to start in-port production of hydrogen. In the long term, there will be electric vessels as well. Stena Line is the closest with its Elektra vessels, which will start calling at the Port of Gothenburg before 2030.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructurePorts & LogisticsVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

17 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

17 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

17 days ago