Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Marine Energy›Wavepiston kicks off installation ops for wave-powered desalination system
Marine Energy

February 1, 2022 · about 4 years ago

Wavepiston kicks off installation ops for wave-powered desalination system

Danish wave energy company Wavepiston has started with the installation operations for its wave-powered desalination system in Canary Islands.

1 minutes read
  • LinkedIn
  • X
  • Email
Wavepiston’s wave-powered desalination system with Vryhof anchors (Courtesy of Wavepiston)
Wavepiston’s wave-powered desalination system with Vryhof anchors (Courtesy of Wavepiston)

Danish wave energy company Wavepiston has started with the installation operations for its wave-powered desalination system in Canary Islands.

In mid-December 2021, the power generation and desalination units were transported and placed on the Oceanic Platform of the Canary Islands (PLOCAN) in Gran Canaria.

After that, Wavepiston started works to connect all relevant piping, so that the units can receive pressurized water from the company’s wave energy system in 2022.

The string parts of the system are currently being produced, and according to Wavepiston, it is requesting quotes for the production of the energy collectors.

The timeline is to be able to commission electricity and desalinated water by September 2022, Wavepiston said.

The mooring components for the wave-powered desalination system have also been shipped to Gran Canaria.

“We have shipped the Vryhof anchors from the Port of Rotterdam and together with chains, mooring rope and tension system they will keep the string with our energy collectors well in place,” Wavepiston said.

The installation of the mooring and string is planned for April 2022.

Wavepiston’s wave energy system consists of energy collectors placed in the ocean. The energy collectors produce pressurized seawater which is transported to the shore where power generation and reverse osmosis units used for desalination are located.

Follow Offshore Energy – Marine Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Marine EnergyTidal & Wave EnergyBusiness Developments & ProjectsEquipmentInnovationOperations & MaintenanceOutlook & StrategyTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free