Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Abu Dhabi player flows first gas from Malaysian field
Business & Finance

March 21, 2022 · about 4 years ago

Abu Dhabi player flows first gas from Malaysian field

Abu Dhabi-based Mubadala Petroleum has started first gas production from the Pegaga gas field in Block SK 320, offshore Malaysia.

2 minutes read
  • LinkedIn
  • X
  • Email
Abu Dhabi-based Mubadala Petroleum

Abu Dhabi-based oil and gas company Mubadala Petroleum has started the first gas production from the Pegaga gas field in Block SK 320, offshore Malaysia.

Mubadala Petroleum has been present in Malaysia since 2010 and is the operator of Block SK 320 with a 55 per cent interest. Petronas Carigali, a subsidiary of Petronas, holds 25 per cent, with Sarawak Shell holding the remaining 20 per cent interest. The project was sanctioned in March 2018 .

The Abu Dhabi firm said in a statement on Monday that this milestone marks the culmination of a challenging gas project, during a period in which the company navigated the challenges of the global pandemic. As a key strategic development for the local energy sector, Pegaga will be a key producing field supplying gas to Petronas LNG Complex , in Bintulu, Sarawak, Malaysia.

The Pegaga gas field is located in the Central Luconia province, offshore Sarawak, Malaysia at about a 108-meter water depth. The development concept comprises an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket.

[The article continues below the image]

The facility is designed for a gas throughput of 550 million standard cubic feet of gas per day plus condensate. The produced gas will be evacuated through a new 4 KM, 38-inch subsea pipeline tying into an existing offshore gas network and subsequently to the onshore Petronas LNG Complex.

The jacket and wellhead deck, which were constructed in Lumut and Kuching fabrication yards, were installed in April 2020 followed by the Pegaga Development Drilling campaign. The ICPP float-over and installation was then completed in August 2021. Sapura was in charge of EPCIC works for the ICPP.

Mansoor Mohamed Al Hamed , CEO of Mubadala Petroleum said that the Pegaga achievement is a landmark for the company. He added: “With our strategic focus on gas as a key bridge fuel in the energy transition, this achievement reflects our ambition for the future as a long-term investor and strategic energy partner.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & ProductionProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago