Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›EDF performs autonomous foundation inspection at Blyth offshore wind farm
Business Developments & Projects

May 23, 2022 · about 4 years ago

EDF performs autonomous foundation inspection at Blyth offshore wind farm

EDF Renewables has carried out what is believed to be the first autonomous wind farm foundation inspection by deploying a customised remotely operated vehicle (ROV) at the Blyth offshore wind farm in the UK. Equipped and operated from the Offshore Robotics for Certification of Assets (ORCA) Hub, the

2 minutes read
  • LinkedIn
  • X
  • Email
EDF Renewables

EDF Renewables has carried out what is believed to be the first autonomous wind farm foundation inspection by deploying a customised remotely operated vehicle (ROV) at the Blyth offshore wind farm in the UK.

Equipped and operated from the Offshore Robotics for Certification of Assets (ORCA) Hub, the ROV carried out visual inspections of the gravity-based foundations over the course of four days.

The trials demonstrated the drone’s ability to work autonomously at the site, as it recorded videos to assess the exterior condition of turbine foundations and cables, EDF said.

The autonomous ROV was also used to create a 3D reconstruction of model parts of the underwater assets, which will be used to monitor biofouling and the accumulation of microorganisms, plants, and algae on the turbine foundations.

“This trial demonstrates the enormous potential for underwater robots to autonomously carry out inspection and maintenance of offshore wind turbines, reducing the need and the associated risks of putting personnel into challenging and hazardous environments,” said Dr. Sen Wang , lead of Robotics and Autonomous Systems at the National Robotarium.

“By equipping the ROV with sensors and robot autonomy software developed by the ORCA Hub, we can obtain high-quality videos and build an extremely accurate 3D model of the turbine foundations, providing rich information in a more efficient manner for companies working in this sector.”

Located off the coast of Northumberland, the first phase of the wind farm consists of five wind turbines constructed in 2017. It has a generating capacity of 41.5 MW and is the first UK offshore wind farm to utilise float and submerge gravity base foundations, as well as 66 kV rated inter-array and export cables to connect the turbines to an onshore substation.

At the end of last year, EDF received the marine licence variation consent for phase two of the Blyth offshore demonstrator wind farm which is expected to have floating foundations and four or five turbines with individual capacities of up to 14 MW, according to the developer.

Register for Offshore Energy Exhibition & Conference:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & MaintenanceResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

13 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

13 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago