Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›UKOG to work on hydrogen-ready energy storage project at Portland Port
Business Developments & Projects

May 30, 2022 · about 4 years ago

UKOG to work on hydrogen-ready energy storage project at Portland Port

UK Oil & Gas (UKOG) is working on the Portland Energy-Hub concept centered around hydrogen-ready gas storage and a future green hydrogen generation capability.

2 minutes read
  • LinkedIn
  • X
  • Email
UKOG to work on hydrogen-ready energy storage project

UK Oil & Gas (UKOG) is working on the Portland Energy-Hub concept centered around hydrogen-ready gas storage and a future green hydrogen generation capability.

On 30 May, UKOG released a statement saying that its wholly-owned subsidiary, UK Energy Storage (UKEn) signed an agreement to lease (A2L) with Portland Port Limited (PPL) covering two sites at the former Royal Navy port in Dorset.

The intent is to develop a planned integrated Energy-Hub, centered around hydrogen-ready gas storage and a future green hydrogen generation capability.

The project is subject to new planning consent and securing necessary development finance.

As agreed between the parties, the Energy-Hub development concept seeks to reinvigorate and build further upon a prior unrealised project by Portland Gas Storage. This project was granted planning consent by Dorset County Council back in 2008. The plan was to situate approximately 43 bcf (1.2 bcm) of underground salt cavern storage beneath PPL’s land.

Using established engineering concepts, public record planning submissions, publicly available data, UKOG internal studies, and technical, engineering and economic modelling advice from Xodus Group, the planned new Energy-Hub is to include the following elements:

The A2L conveys to UKEn the exclusive right to proceed with the development and enter into a 30-year lease. This is in the case that certain conditions are met to UKEn’s satisfaction.

The A2L contains agreed forms of the lease and operating agreements and contains a longstop date which, unless otherwise agreed, will allow UKEn to terminate if the conditions have not been met within four years of the effective date. The lease also grants UKEn the discretionary right at five-yearly intervals to continue or break the lease.

The aggregate total ground rent payable by UKEn up to the A2L longstop date is approximately £0.9 million ($1.1 million).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInfrastructurePorts & LogisticsProject & TendersStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago