Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Largest US-built LNG bunker barge to feature TGE Marine’s cargo handling system
Business Developments & Projects

June 8, 2022 · about 4 years ago

Largest US-built LNG bunker barge to feature TGE Marine’s cargo handling system

German engineering contractor TGE Marine has secured a contract with the US-based Fincantieri Bay Shipbuilding to design and supply a cargo handling system for a 12,000 cbm liquefied natural gas (LNG) bunkering barge. Under the contract, TGE Marine will design and supply the cargo handling system in

1 minutes read
  • LinkedIn
  • X
  • Email
Largest US-built LNG bunker barge to feature TGE Marine’s cargo handling system

German engineering contractor TGE Marine has secured a contract with the US-based Fincantieri Bay Shipbuilding to design and supply a cargo handling system for a 12,000 cbm liquefied natural gas (LNG) bunkering barge.

Under the contract, TGE Marine will design and supply the cargo handling system including two 6,000 cbm Bi-Lobe type C tanks designed to transport LNG at -163°C.

As explained, the cargo handling system will enable the barge to load LNG from a supply terminal and transfer the LNG to the clients’ vessels using a ship-to-ship transfer system.

During transit, the cargo can be kept in its liquid state at ambient pressure through the use of a chiller unit.

The barge is being constructed for the Florida-based marine solutions, transportation and logistics company Crowley and will be operated under a long-term charter with energy major Shell.

The construction of what is described as the largest US-built LNG bunkering barge began at Fincantieri Bay Shipbuilding in Sturgeon Bay, Wisconsin on 6 January 2022.

The shipyard is expected to complete the construction of the 126.7-metre-long barge in late 2023 and the vessel will start operations along the US East Coast in 2024.

Register for Offshore Energy Exhibition & Conference:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInfrastructureProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago