Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Gas transmission starts through Baltic Pipe
Cabling

October 3, 2022 · about 4 years ago

Gas transmission starts through Baltic Pipe

Gas transmission from Norway to Poland via Denmark has started through the new Baltic Pipe pipeline, Polish gas transmission system operator GAZ-SYSTEM announced on Saturday, 1 October. The flow started at 6:10 a.m. and nominations as of 1 October totaled 62.4 million kilowatt-hours/day. Baltic Pipe

1 minutes read
  • LinkedIn
  • X
  • Email
Gas transmission starts through Baltic Pipe
GAZ-SYSTEM

Gas transmission from Norway to Poland via Denmark has started through the new Baltic Pipe pipeline, Polish gas transmission system operator GAZ-SYSTEM announced on Saturday, 1 October.

The flow started at 6:10 a.m. and nominations as of 1 October totaled 62.4 million kilowatt-hours/day.

This content is available after accepting the cookies.

Zgodnie z obietnicą złożoną ponad 6 lat temu – dotrzymaliśmy słowa. Dziś o godz. 6:10 ruszył do Polski przesył gazu gazociągiem #BalticPipe . Nominacja dobowa na 1 października 2022 wynosi 62,4 mln kWh/doba. https://t.co/rwHoA28l3T

Baltic Pipe was officially inaugurated on 27 September, a day after leaks were detected on the Nord Stream gas pipelines linking Russia to Europe.

It is said to be one of the largest infrastructure investments in Poland and has been awarded the “Project of Common Interest” status by the European Commission.

The gas pipeline was initially planned to be commissioned on 1 January 2023, however, GAZ-SYSTEM and Energinet announced that it can be put into full operation from the end of November.

The 274-kilometer link will have a full annual capacity of up to 10 BCM.

Related Articles

Cabling

First gas flows between Denmark and Norway after Baltic Pipe North Sea construction ends

2 min read

Register for Offshore Energy Exhibition & Conference:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingDeepwater InstallationFossil EnergyOil & GasSubseaBusiness Developments & ProjectsInfrastructureOutlook & StrategyProject & TendersTransition

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free