Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Holland Shipyards to build 4 autonomous, all-electric ferries for Sweden
Business Developments & Projects

October 7, 2022 · about 3 years ago

Holland Shipyards to build 4 autonomous, all-electric ferries for Sweden

Dutch shipbuilder Holland Shipyards Group has signed a contract with the Swedish Transport Administration (Trafikverket) for the delivery of two plus two autonomous all-electric ferries.

2 minutes read
  • LinkedIn
  • X
  • Email
Holland Shipyards Group

Dutch shipbuilder Holland Shipyards Group has signed a contract with the Swedish Transport Administration ( Trafikverket ) for the delivery of two plus two autonomous all-electric ferries.

As informed, the first ferry is scheduled to be delivered in the second half of 2024 and the other ferries will arrive in constant intervals after the first.

The signed contract includes the delivery of two ferries with four automooring facilities and two charging stations, a simulator facility and a remote control center. The tender covers the entire procurement — four ferries, eight automooring facilities, four charging stations and more, according to Holland Shipyards.

The ferries, measuring 86.00 metres by 14.24 metres with a 60-car carrying capacity, will sail according to autonomy level 2 and will be controlled from the remote control center based in Stockholm.

As defined by the International Maritime Organization (IMO), degree 2 of vessel autonomy means that a vessel is remotely monitored, but does have crew on board that can take control whenever necessary. Crossing the ferry route can be done with just the push of a button. While mooring, the vessels are charged by a shore charging facility within approximately four minutes.

The implementation of autonomous sailing technology is intended to increase passenger safety in the long run. When a fully operational system is in place, situations can be dealt with in an entirely consistent manner, reducing the risk of ‘unexpected’ actions.

Reducing the dependency on crew on board requires that many systems are remotely operable and are redundant, so that, when one way of operation fails, another route remains available. This means that the level of inputs and outputs into the ship’s Integrated Automations System (IAS) will be large. The IAS in turn will be mirrored in a remote control center, allowing on-shore monitoring personnel full access to all the ship’s vital functionalities.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInfrastructureInnovationVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago