Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Germany’s first LNG terminal launched after ten-month work
Clean Fuel

December 19, 2022 · about 3 years ago

Germany’s first LNG terminal launched after ten-month work

Germany’s first floating terminal for importing liquefied natural gas (LNG) in Wilhelmshaven has officially been commissioned for service. On 17 December, German energy major Uniper informed that the terminal was launched and that even before Christmas, LNG will be re-gasified and conveyed via the n

2 minutes read
  • LinkedIn
  • X
  • Email
Germany’s first LNG terminal launched after ten-month work
Courtesy of Niedersachsen Ports

Germany’s first floating terminal for importing liquefied natural gas (LNG) in Wilhelmshaven has officially been commissioned for service.

On 17 December, German energy major Uniper informed that the terminal was launched and that even before Christmas, LNG will be re-gasified and conveyed via the newly created Wilhelmshavener Anbindungsleitung (Wilhelmshaven Connector Pipeline/WAL) into the German long-distance gas grid.

This is enabled by the recent arrival of the floating storage and regasification unit (FSRU) Höegh Esperanza which was chartered by the government from Norwegian company Höegh LNG.

Related Articles

Clean Fuel

FSRU arrives in Wilhelmshaven ahead of opening of Germany’s first LNG terminal

2 min read

Uniper, the operator of the Wilhelmshaven terminal, expects an annual volume of at least five billion cubic metres of natural gas to be imported and fed into the German long-distance gas grid via this terminal.

Klaus-Dieter Maubach , CEO of Uniper, said: “Today, after a project duration of merely ten months, we are proud to commission Germany’s first LNG Terminal in Wilhelmshaven. This goes to show what Germany is capable of and it could be the blueprint for other projects of the energy transition. I would like to thank all the people that helped implement this project before the first critical winter: the project team at Uniper, the project partner companies, and last, but not least, the participants in the public sector.

“For the short term, we are now able to cover about 6% of our gas needs with LNG that is shipped directly to Germany. But one thing is clear: The investments in this project are also investments in a future without CO2: In the mid- to long-term, Uniper’s project ‘Green Wilhelmshaven’ is slated to make a great contribution to the decarbonisation of the German industry through the import of green ammonia and through the production of green hydrogen.”

The preparation works for Germany’s first LNG terminal started about ten months ago when the government set the new course for the energy supply in order to strengthen its energy security as early as this winter and to diversify its gas sourcing.

Approval documents were prepared in the spring, followed by the start of construction with the first pile-driver blow on 5 May.

The FSRU was chartered in July and construction work and pipe laying for the connection pipeline kicked off in August.

The port jetty was completed in November and the Höegh Esperanza arrived at the terminal on time last week.

Related Articles

Clean Fuel

Germany’s first floating LNG terminal ready to welcome first FSRU in mid-December

2 min read

Click here to read more about the latest updates on Germany’s efforts to secure LNG supplies.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelGreen MarineLNGBusiness Developments & ProjectsInfrastructureOutlook & Strategy

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free