Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Basque Energy Agency opens tender for Mutriku wave power plant’s new turbines
Business & Finance

January 5, 2023 · about 3 years ago

Basque Energy Agency opens tender for Mutriku wave power plant’s new turbines

The Basque Energy Agency (EVE) has launched a call to for proposals for the development of air turbines that will be implemented in the Mutriku wave power plant.

2 minutes read
  • LinkedIn
  • X
  • Email
Mutriku wave power plant's air turbines (Courtesy of EVE)

The Basque Energy Agency (EVE) has launched a call to for proposals for the development of air turbines that will be implemented in the Mutriku wave power plant.

The four-year, €3.2 million collaborative program, is now accepting proposals for the first phase , in which several air turbine projects will be selected for the development of concept designs.

The pre-commercial public purchase program, dubbed TurboWave , will be open until February 16, 2022, and aims to accelerate the development of air turbine technologies that respond to needs of the wider wave energy sector.

More specifically, the air turbines developed as part of this procurement will primarily be used for the Mutriku wave power plant located at the breakwater in the Bay of Biscay.

The process is expected to culminate in 2026 with the selection of one successful technology that will be supplied to the world’s longest operating wave power plant , which has been in service for more than 11 years to date.

Equipped with oscillating water column (OWC) units with a total installed capacity of 296kW, the currently operational Mutriku power plant is said to produce approximately 300MWh annually, which is equivalent to the electrical energy consumed by 100 homes in one year.

Since its commissioning in 2011, the plant – which hosts 16 air turbines in total – has produced more than 2.8GWh of clean power to the Basque Country’s electricity grid, according to the latest available information by EVE.

The launch of the tender follows EVE’s preliminary market consultation, whose results were presented in October 2022 .

Subscribe and follow

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsEquipmentInfrastructureInnovationOutlook & StrategyProject & TendersTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago