Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›New assignment for Equinor to tackle nonconformities at North Sea project
Authorities & Government

January 12, 2023 · about 3 years ago

New assignment for Equinor to tackle nonconformities at North Sea project

Norway’s regulator is awaiting a response from Equinor regarding the way the identified nonconformities will be sorted out.

2 minutes read
  • LinkedIn
  • X
  • Email
New assignment for Equinor to tackle nonconformities at North Sea project

After conducting an audit of Equinor’s system for follow-up of technical and operational barriers at a project in the Norwegian sector of the North Sea, Norway’s offshore safety regulator is awaiting a response from the state-owned energy giant regarding the way the identified nonconformities will be handled.

The Petroleum Safety Authority Norway (PSA) informed earlier this week that it had conducted this audit from 10 to 28 October 2022 with the objective of verifying that Equinor’s own management system at Grane complies with the regulatory requirements in terms of detecting faults or weaknesses in technical and operational barriers, such that the Norwegian giant maintains a prudent HSE level.

During this investigation, the regulator identified breaches of the regulations, which entail two nonconformities, concerning barrier management and fire protection. In addition, the PSA observed three factors categorised as improvement points, which include barrier management in the Breidablikk project ; improvement of the TTS (technical condition safety) process; and operational and organisational barrier elements.

As a result, the safety watchdog has asked Equinor to report how these nonconformities will be addressed by 15 February 2023 and provide an assessment of the improvement points observed.

Located in the central North Sea, east of the Balder field in a water depth of 128 metres, the Grane field was discovered in 1991 and the plan for development and operation (PDO) was approved in 2000. This project has been developed with an integrated accommodation, drilling and processing facility with 40 well slots and a steel jacket. The production at the field started in 2003 and the Svalin field is tied-back to the Grane platform .

Equinor is currently working on the Breidablikk subsea tie-back development, which will be tied to the Grane platform for oil processing before being brought ashore at the Sture terminal.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness & FinanceBusiness Developments & ProjectsOperations & MaintenanceProject & TendersRegulation & PolicyRules & Regulation

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago