Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Leviathan partners set the ball rolling for Israeli floating LNG terminal
Clean Fuel

February 21, 2023 · about 3 years ago

Leviathan partners set the ball rolling for Israeli floating LNG terminal

Partners in the Leviathan gas field offshore Israel have approved budgets for 2023 which include nearly $100 million for the expansion of the existing infrastructure and preparation of the future floating LNG terminal. Said to be the largest energy project in Israel’s history, the deep-sea field sta

2 minutes read
  • LinkedIn
  • X
  • Email
Leviathan partners set the ball rolling for Israeli floating LNG terminal
Courtesy of NewMed Energy

Partners in the Leviathan gas field offshore Israel have approved budgets for 2023 which include nearly $100 million for the expansion of the existing infrastructure and preparation of the future floating LNG terminal.

Said to be the largest energy project in Israel’s history, the deep-sea field started supplying gas to Israel, Egypt and Jordan at the end of 2019.

The rights holders in the Leviathan project are NewMed Energy (with a working interest of 45.3%), Chevron (which was called “Noble Energy” at the time, with a working interest of 39.7%) and Ratio Energies (with a working interest of 15%).

On 21 February, the partners announced their decision to spend $51.5 million on the preparation of the floating LNG facility, with an annual production capacity of approximately 4.6 million tons of LNG.

The remaining $44.9 million will be dedicated to the performance of front-end engineering and design (FEED) for Phase 1B for the development of the Leviathan reservoir, with the aim of increasing the total gas production capacity by an additional 9 bcm per year, i.e. to the sum total of approximately 21 bcm per year.

The expansion of the Leviathan reservoir’s production system will include the design of subsea infrastructures and necessary changes on the production platform, NewMed explained.

The expansion and the future floating LNG facility are also necessary for the possible LNG deliveries from the Leviathan reservoir to Germany under the memorandum of understanding (MoU) which was signed last year by NewMed and Uniper.

Related Articles

Clean Fuel

Uniper partners with NewMed Energy on LNG and hydrogen to minimise energy crisis

2 min read

Follow Offshore Energy’s Clean Fuel on social media:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelFossil EnergyLNGOil & GasBusiness & FinanceBusiness Developments & ProjectsInfrastructureOutlook & Strategy

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free