Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Brazilian FPSO goes back online
Fossil Energy

February 28, 2023 · about 3 years ago

Brazilian FPSO goes back online

Enauta has completed the preventive maintenance activities for an FPSO, which is carrying out operations on a field offshore Brazil.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO Petrojarl I; Source: Altera Infrastructure
FPSO Petrojarl I; Source: Altera Infrastructure

Brazilian oil and gas player Enauta has completed the preventive maintenance activities for a floating, production, storage, and offloading (FPSO) vessel, which is carrying out operations on a field offshore Brazil.

Enauta disclosed on Monday, 27 February 2023, that the preventive maintenance of the water-cooling system of the FPSO Petrojarl I was concluded and the production at the Atlanta field was stabilised on Sunday, 26 February 2023, according to the estimated schedule.

Related Articles

Fossil Energy

FPSO working off Brazil undergoing preventive maintenance

2 min read

Regarding the Brazilian player’s recent activities at the Atlanta field, the firm kicked off a three-well drilling campaign at the end of 2022 and the first well, which is in the connection phase to the FPSO Petrojarl I, should start production in April 2023, when the FPSO will have three wells online, which is its maximum capacity.

With the entry of this new well, the Atlanta field’s potential production will be increased to more than 20,000 barrels of oil per day . The company bought the FPSO OSX-2 for Atlanta’s Full Development System (FDS) last year. The FDS is expected to be online by mid-2024, originally with six wells , reaching ten wells in 2029 . This FPSO, known as the FPSO Atlanta , is anticipated to be fully operational by 2024.

Located in block BS-4 in the Santos Basin , at a 1,500-metre water depth, the Atlanta field is operated by Enauta Energia, a wholly-owned subsidiary of the company, which also has a 100 per cent interest in this asset. The field has estimated reserves of 106 MMbbl.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free