Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Pemex hands over development plan for giant oil field off Mexico
Authorities & Government

March 27, 2023 · about 3 years ago

Pemex hands over development plan for giant oil field off Mexico

Pemex has submitted a unit development plan (UDP) for an oil field offshore Mexico to the National Hydrocarbons Commission.

2 minutes read
  • LinkedIn
  • X
  • Email
The Valaris 8503 rig was used for Zama appraisal. Source: Talos Energy

Mexico’s state-owned petroleum company Pemex has submitted a unit development plan (UDP), on behalf of its partners – Wintershall Dea, Talos Energy, and Harbour Energy – for an oil field offshore Mexico to the National Hydrocarbons Commission.

Pemex revealed last week that the Zama unit development plan was handed over for formal approval to the National Hydrocarbons Commission. This project is seen as a strategic one by Pemex and Mexico’s government. According to the Mexican giant, the development plan includes two offshore platforms, the drilling and completion of 46 wells, as well as the transportation of oil and gas produced to the new onshore facilities of the unit at the Dos Bocas Maritime Terminal.

Discovered in 2017 by Talos, the Zama field was fully evaluated in 2019 by the Block 7 consortium, made up of Talos, Wintershall Dea and Harbour. This project will be developed to reach a production of up to 180,000 barrels per day of API gravity oil between 24 and 27º, which represents approximately 10 per cent of the country’s current oil production. The production of hydrocarbons will consist of 94 per cent excellent quality oil.

Zama is a shared reservoir that extends from the Talos-operated Block 7 to neighbouring Pemex AE-0152-Uchukil Asignación in the Cuencas del Sureste, in the Bay of Campeche in Mexico. Unitisation of the Zama field was required after a determination that the field is located within both the Talos-operated block and the adjacent Pemex-operated block and provides for joint development of the entire reservoir instead of each party developing its own block.

Considering that Pemex and Talos did not see eye to eye when it comes to the unitisation, Mexico’s Ministry of Energy (SENER) in July 2021 designated Pemex as the operator of the Zama unit, much to the disappointment of Talos. The company then decided to explore all legal and strategic options to resolve the situation. In September 2021, Talos filed notices of dispute to the government of Mexico over decisions taken by SENER.

Following SENER’s final unitisation resolution (UR) from last year regarding the development of the Zama field offshore Mexico, Talos maintains a 17.35 per cent participating interest in the Zama field. An independent third-party reserves auditor estimated the discovered recoverable resource volumes to be between approximately 735 – 950 million barrels of oil equivalent . Zama could produce over 160,000 barrels of oil equivalent per day once fully developed.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionProject & TendersRegulation & PolicyRules & Regulation

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago