Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›With inspection and maintenance underway, Brazilian FPSO expected back online in mid-April
Business & Finance

April 6, 2023 · about 3 years ago

With inspection and maintenance underway, Brazilian FPSO expected back online in mid-April

Brazil’s Karoon Energy has stopped production from assets connected to an FPSO after running into an issue.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO Cidade de Itajaí; Source: Altera Infrastructure

Australia’s oil and gas company Karoon Energy has stopped production from assets connected to a floating, production, storage, and offloading (FPSO) vessel after running into an issue and the FPSO is currently undergoing inspection and maintenance work, which is slated to end next week.

Karoon reported earlier in the week that Baúna production, including from the Patola field, was shut-in on 28 March 2023 in “a safe and controlled manner,” due to a loss of containment incident associated with the high-pressure flare on the FPSO Cidade de Itajaí . After the FPSO operator, Altera and Ocyan, mobilised a team of specialists to the FPSO to identify the source of the leak and undertake repairs, these were completed on 30 March 2023.

However, Karoon explains that it decided, together with the FPSO operator, to extend the shutdown to undertake a full inspection and testing of associated systems, and to bring forward some of the planned July maintenance programme due to the higher-than-expected flow rates from the Patola wells, and the associated pressure that places on the FPSO processing system.

According to the Brazilian firm, the inspection and accelerated maintenance work is expected to be completed by mid-April 2023, allowing production to restart. Due to higher-than-anticipated production rates seen from the intervention programme and Patola, the company’s production guidance for the full-year 2023 remains unchanged, despite the current shutdown.

Built in 1995 at the Jurong shipyard in Singapore and converted in 2012, the FPSO Cidade de Itajaí , which is capable of operating in water depths of up to 1,000 meters, started operating in Brazil in February 2013. This FPSO has the capacity to produce 80,000 barrels of oil per day and compress 2 million cubic meters of gas per day.

The production shutdown comes two weeks after Karoon kicked off production from one of two new production wells drilled into the Patola field, with first production rates surpassing expectations. In addition, the production from the second well was expected to begin by the end of March 2023.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & ProductionOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago