Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Two Brazilian wells back online while third one awaits pump replacement
Business & Finance

April 27, 2023 · about 3 years ago

Two Brazilian wells back online while third one awaits pump replacement

Enauta has restarted production from two wells offshore Brazil while a third well is expected to come on stream after a pump replacement.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO Petrojarl I; Source: Enauta

Following production interruption, Enauta, a Brazilian oil and gas player, has restarted production from two wells located on a field offshore Brazil while a third well is expected to come on stream after getting a pump replacement.

Enauta temporarily interrupted the production at the Atlanta field on Tuesday, 25 April 2023. Based on the firm’s technical area, preliminary assessments indicated failure of subsea equipment associated with the 7-ATL-2HP-RJS well while the other two wells were expected to return to production later that day. In an update on Wednesday, 26 April 2023, the Brazilian player confirmed the production from the 7-ATL-4H-RJS and 7-ATL-5H-RJS wells was resumed, as expected.

However, the 7-ATL-2HP-RJS well remains inoperative and needs to have its pump replaced by a reserve pump. Enauta says that the return to production is scheduled for the month of June, after the planned shutdown. Currently, the production at the Atlanta field is approximately 12 thousand bbl/d and is still ramping up.

Located in block BS-4 in the Santos Basin , at a 1,500-metre water depth, the Atlanta field has been producing since 2018 through an Early Production System (EPS), which entails three wells connected to the FPSO Petrojarl I . The field is operated by Enauta Energia, a wholly-owned subsidiary of the company, which has a 100 per cent interest in this asset. The field’s reserves are estimated at 106 MMbbl.

Furthermore, the company bought the FPSO OSX-2 for Atlanta’s Full Development System (FDS) last year. This FPSO, known as the FPSO Atlanta , which will replace the FPSO Petrojarl I, is anticipated to be fully operational by 2024. The FDS is expected to be online by mid-2024, originally with six wells , reaching ten wells in 2029 .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & ProductionOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

12 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

12 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago